K Electric / PMT BLAST & KE NEGLIENCE

K Electric Reviews & Complaints

By: Ashfaq Sharif

Contact information:
K Electric
KE careless & Poor management – staff

I want to drawn attention of top management of KE, Governor of Sind, Nepra what reason KE install defective and low standard PMT.

In our area of SOLDIER BAZAR today ( Jul 5, 18 )power supply disturb and dis-continue at 10 am due to PMT BLAST and how is KE negligence and carless power restore at 6 pm evening. Does KE staff feel pain or problem to remove the fault at earliest.

Those who are negligence and careless staff in the shape of BLACK SHEEP dept should get rid of it so the consumer do not force to stay without electricity so long hours. Does KE have powerless to do this healthy exercise.

KE have learned how to torture the consumers in the best way? Waste whole day without doing work credit goes to KE negligence and careless staff and management.

Ever KE heatless management realized how elder people, children, women’s and patient force to stay too long hours without electricity. Why not KE management you people perform job one whole day without the electricity and do not run your generator than realized the problems of other consumers.

KE still fail to conduct load shedding for 48 hours in a single day, when it succeeded to do that time Pakistan become ASIAN Tiger.

If same PMT BLAST problem faced in Karachi any VVVIP location than KE staff shows same efforts of negligence and careless?

Leave a Comment

Your email address will not be published. Required fields are marked *

© 2023 Pakistan Complaints Forum
Contact Us